Possible failure mode and preventive measures in pressure pipe line construction
| dc.contributor.author | Jahfar, M.I. | |
| dc.contributor.author | Kailasan, M. | |
| dc.date.accessioned | 2020-12-03T06:00:44Z | |
| dc.date.available | 2020-12-03T06:00:44Z | |
| dc.date.issued | 2002 | |
| dc.identifier.citation | Engineer, 35(1):p.67-71 | |
| dc.identifier.uri | https://dl-iesl.nsf.gov.lk/handle/1/2624 | |
| dc.publisher | Institution of Engineers:Colombo | |
| dc.subject | Engineering and Technology | |
| dc.subject | Pipe line construction | |
| dc.subject | Preventive measures | |
| dc.subject | Excavation operation | |
| dc.subject | Backfilling | |
| dc.subject | Hydraulic failure | |
| dc.title | Possible failure mode and preventive measures in pressure pipe line construction | |
| dc.type | Article |